A) Firstly, waste water from site to the two stage collection tank (others).
B) Secondly, 1.3 days holding two stage collection tank (others).
C) Thirdly, 50mm PVC piping connecting the Sewage Treatment Plant to the collection tank via 0.75kW submersible pump.
D) Start of the STP, by means of 3 x 5000lt bio-reactors with 2 x 0.75kW circulation pumps per reactor.
E) Discharge(sludge) from clarifier sent back to second stage collection tank via gravity on a weekly basis, which forms part of the weekly maintenance.
F) Treated water is discharged from 2500lt by means of a 0.75kW after sterilization of O3 (ozone) 0.06kW ozoniser and a 0.75kW circulation pump.